Tahun Anggaran

img
Paket

71

img
Pagu

328.409.544.462

img
Silpa

19.891.200.245

img
Penawaran

308.518.344.218

Progress Tender
Semua Belum e-Kontrak Belum Penilaian Kinerja Selesai
Jenis Paket Pagu Paket Pagu Paket Pagu Paket Pagu
Tender 66 320.896.195.462 15 191.030.174.900 66 320.896.195.462 0 0
Seleksi 2 6.083.990.000 1 4.084.520.000 2 6.083.990.000 0 0
Tender Cepat 3 1.429.359.000 1 470.250.000 3 1.429.359.000 0 0
Total 71 328.409.544.462 17 195.584.944.900 71 328.409.544.462 0 0
Persentase 23.94 % 100 % 0 %
Metode Pemilihan
Tender
Seleksi
Tender_cepat
93.0%2.8%4.2%
Tender Perbulan
30302525202015151010550011142910871November 2020November 2020January 2021January 2021April 2021April 2021May 2021May 2021June 2021June 2021July 2021July 2021August 2021August 2021September 2021September 2021
Download SVG
Download PNG
Download CSV
NoTahun AnggaranNama SatkerNama PaketMetode PemilihanJenis PengadaanKode TenderKode RUPSumber DanaPaguHPSNilai PenawaranNilai TerkoreksiNilai NegosiasiNilai KontrakNilai PDN KontrakNilai UMK KontrakTanggal Pengumuman TenderTanggal Penetapan PemenangTanggal KontrakNPWP Penyedia Pemenang TenderNama Penyedia Pemenang TenderNPWP Penyedia BerkontrakNama Penyedia BerkontrakSisa Selisih Pagu (silpa)Persentase SilpaNilai Kinerja Penyedia
1 2021 RSUD PAMBALAH BATUNG KABUPATEN HULU SUNGAI UTARA Penyusunan Detail Engenering Desain (DED) Rumah Sakit Daerah Baru Kabupaten Hulu Sungai Utara Seleksi Jasa Konsultansi Badan Usaha Non Konstruksi 1707085 26508644 BLUD 4,084,520,000 4,080,186,825 3,444,423,950 3,444,423,950 3,444,423,950 0 0 0 2020-11-09 08:00:00 2021-01-20 01.555.333.2-441.000 PT. PENTA REKAYASA 640,096,050 15.67 %
2 2021 DINAS KESEHATAN KABUPATEN HULU SUNGAI UTARA Konsultan Manajemen Konstruksi Pembangunan Rumah Sakit Seleksi Jasa Konsultansi Badan Usaha Non Konstruksi 1722085 26941893 APBD 1,999,470,000 1,999,444,000 1,819,422,000 1,819,422,000 1,819,422,000 1,805,777,000 0 0 2021-01-13 10:00:00 2021-03-04 2021-04-06 01.139.515.9-517.000 PT. SARANABUDI PRAKARSARIPTA 01.139.515.9-517.000 PT. SARANABUDI PRAKARSARIPTA 180,048,000 9 %
3 2021 DINAS PEKERJAAN UMUM PENATAAN RUANG DAN PERTANAHAN KABUPATEN HULU SUNGAI UTARA Rekonstruksi / Peningkatan Kapasitas StrukturJalan Sei. Sandung - Balukar Panjang Tender Pekerjaan Konstruksi 1725085 29019081 APBD 3,600,000,000 3,586,871,000 3,498,577,667 3,498,577,667 3,498,577,667 3,498,577,650 3,498,577,650 0 2021-04-27 09:00:00 2021-05-28 2021-06-10 75.885.417.8-735.000 PT. Cahaya Sambang Sejahtera 75.885.417.8-735.000 PT. Cahaya Sambang Sejahtera 101,422,333 2.82 %
4 2021 DINAS PEKERJAAN UMUM PENATAAN RUANG DAN PERTANAHAN KABUPATEN HULU SUNGAI UTARA Rekonstruksi / Peningkatan Kapasitas Struktur Jalan Murung Mamar - Sungai Malang Tender Pekerjaan Konstruksi 1726085 29019002 APBD 2,500,000,000 2,498,700,000 2,471,921,538 2,471,921,538 2,471,921,538 2,471,921,500 2,471,921,500 0 2021-04-27 09:00:00 2021-05-28 2021-06-10 93.320.388.7-736.000 CV. BERKAH AL ABRAR 93.320.388.7-736.000 CV. BERKAH AL ABRAR 28,078,462 1.12 %
5 2021 DINAS PEKERJAAN UMUM PENATAAN RUANG DAN PERTANAHAN KABUPATEN HULU SUNGAI UTARA Lanjutan Peningkatan Jalan Guntung - Kayu Gatah Tender Pekerjaan Konstruksi 1729085 28899187 APBD 2,248,900,000 1,980,303,000 1,959,987,014 1,959,987,014 1,959,987,014 1,959,987,000 1,959,987,000 0 2021-04-27 09:00:00 2021-05-28 2021-06-10 02.475.425.1-735.000 cv.agung perkasa 02.475.425.1-735.000 cv.agung perkasa 288,912,986 12.85 %
6 2021 DINAS PEKERJAAN UMUM PENATAAN RUANG DAN PERTANAHAN KABUPATEN HULU SUNGAI UTARA Lanjutan Peningkatan Jalan Murung Padang Tender Pekerjaan Konstruksi 1730085 28902731 APBD 3,008,999,176 1,859,532,000 1,840,077,634 1,840,077,634 1,840,077,634 1,840,077,600 1,840,077,600 0 2021-04-27 09:00:00 2021-05-28 2021-06-10 01.249.228.6-735.000 CV HANAMAS 01.249.228.6-735.000 CV HANAMAS 1,168,921,542 38.85 %
7 2021 DINAS PEKERJAAN UMUM PENATAAN RUANG DAN PERTANAHAN KABUPATEN HULU SUNGAI UTARA Lanjutan Peningkatan Jalan Panawakan - batas tabalong Tender Pekerjaan Konstruksi 1731085 28899263 APBD 2,289,254,999 2,274,587,000 2,251,580,517 2,251,580,517 2,251,580,517 2,251,580,500 2,251,580,500 0 2021-04-27 09:00:00 2021-05-28 2021-06-10 02.019.254.8-735.000 cv.doa ibu 02.019.254.8-735.000 cv.doa ibu 37,674,482 1.65 %
8 2021 DINAS PEKERJAAN UMUM PENATAAN RUANG DAN PERTANAHAN KABUPATEN HULU SUNGAI UTARA Peningkatan Jalan Hambuku Raya - Hambuku Pasar Tender Pekerjaan Konstruksi 1734085 28899881 APBD 2,401,356,250 1,986,266,000 1,966,201,641 1,966,201,641 1,966,201,641 1,966,201,600 1,966,201,600 0 2021-04-27 09:00:00 2021-05-28 2021-06-10 90.253.448.6-735.000 CV. JANGAN LUPA BAHAGIA 90.253.448.6-735.000 CV. JANGAN LUPA BAHAGIA 435,154,609 18.12 %
9 2021 DINAS PEKERJAAN UMUM PENATAAN RUANG DAN PERTANAHAN KABUPATEN HULU SUNGAI UTARA Peningkatan Jalan Sungai Pinang - Pematang Benteng Tender Pekerjaan Konstruksi 1736085 28900043 APBD 4,104,000,000 3,976,538,000 3,948,533,642 3,948,533,642 3,948,533,642 3,948,533,600 3,948,533,600 0 2021-04-27 09:00:00 2021-05-28 2021-06-10 70.733.060.1-731.000 PT. AQILA AGUNG MULTI PERSADA 70.733.060.1-731.000 PT. AQILA AGUNG MULTI PERSADA 155,466,358 3.79 %
10 2021 DINAS PEKERJAAN UMUM PENATAAN RUANG DAN PERTANAHAN KABUPATEN HULU SUNGAI UTARA Rehabilitasi Jaringan Irigasi DIR Kayakah Desa Kayakah Kecamatan Amuntai Selatan Tender Pekerjaan Konstruksi 1737085 29125348 APBD 2,000,000,000 1,999,700,000 1,979,504,733 1,979,504,733 1,971,579,000 1,971,579,000 1,971,579,000 0 2021-04-27 09:00:00 2021-05-28 2021-06-11 01.249.228.6-735.000 CV HANAMAS 01.249.228.6-735.000 CV HANAMAS 20,495,267 1.02 %
Showing 1 to 10 of 71 entries
<
NoTahun AnggaranNama SatkerNama PaketMetode PemilihanJenis PengadaanKode TenderKode RUPSumber DanaPaguHPSNilai PenawaranNilai TerkoreksiNilai NegosiasiNilai KontrakNilai PDN KontrakNilai UMK KontrakTanggal Pengumuman TenderTanggal Penetapan PemenangTanggal KontrakNPWP Penyedia Pemenang TenderNama Penyedia Pemenang TenderNPWP Penyedia BerkontrakNama Penyedia BerkontrakSisa Selisih Pagu (silpa)Persentase SilpaNilai Kinerja Penyedia
1 2021 DINAS PEKERJAAN UMUM PENATAAN RUANG DAN PERTANAHAN KABUPATEN HULU SUNGAI UTARA Rekonstruksi / Peningkatan Kapasitas StrukturJalan Sei. Sandung - Balukar Panjang Tender Pekerjaan Konstruksi 1725085 29019081 APBD 3,600,000,000 3,586,871,000 3,498,577,667 3,498,577,667 3,498,577,667 3,498,577,650 3,498,577,650 0 2021-04-27 09:00:00 2021-05-28 2021-06-10 75.885.417.8-735.000 PT. Cahaya Sambang Sejahtera 75.885.417.8-735.000 PT. Cahaya Sambang Sejahtera 101,422,333 2.82 %
2 2021 DINAS PEKERJAAN UMUM PENATAAN RUANG DAN PERTANAHAN KABUPATEN HULU SUNGAI UTARA Rekonstruksi / Peningkatan Kapasitas Struktur Jalan Murung Mamar - Sungai Malang Tender Pekerjaan Konstruksi 1726085 29019002 APBD 2,500,000,000 2,498,700,000 2,471,921,538 2,471,921,538 2,471,921,538 2,471,921,500 2,471,921,500 0 2021-04-27 09:00:00 2021-05-28 2021-06-10 93.320.388.7-736.000 CV. BERKAH AL ABRAR 93.320.388.7-736.000 CV. BERKAH AL ABRAR 28,078,462 1.12 %
3 2021 DINAS PEKERJAAN UMUM PENATAAN RUANG DAN PERTANAHAN KABUPATEN HULU SUNGAI UTARA Lanjutan Peningkatan Jalan Guntung - Kayu Gatah Tender Pekerjaan Konstruksi 1729085 28899187 APBD 2,248,900,000 1,980,303,000 1,959,987,014 1,959,987,014 1,959,987,014 1,959,987,000 1,959,987,000 0 2021-04-27 09:00:00 2021-05-28 2021-06-10 02.475.425.1-735.000 cv.agung perkasa 02.475.425.1-735.000 cv.agung perkasa 288,912,986 12.85 %
4 2021 DINAS PEKERJAAN UMUM PENATAAN RUANG DAN PERTANAHAN KABUPATEN HULU SUNGAI UTARA Lanjutan Peningkatan Jalan Murung Padang Tender Pekerjaan Konstruksi 1730085 28902731 APBD 3,008,999,176 1,859,532,000 1,840,077,634 1,840,077,634 1,840,077,634 1,840,077,600 1,840,077,600 0 2021-04-27 09:00:00 2021-05-28 2021-06-10 01.249.228.6-735.000 CV HANAMAS 01.249.228.6-735.000 CV HANAMAS 1,168,921,542 38.85 %
5 2021 DINAS PEKERJAAN UMUM PENATAAN RUANG DAN PERTANAHAN KABUPATEN HULU SUNGAI UTARA Lanjutan Peningkatan Jalan Panawakan - batas tabalong Tender Pekerjaan Konstruksi 1731085 28899263 APBD 2,289,254,999 2,274,587,000 2,251,580,517 2,251,580,517 2,251,580,517 2,251,580,500 2,251,580,500 0 2021-04-27 09:00:00 2021-05-28 2021-06-10 02.019.254.8-735.000 cv.doa ibu 02.019.254.8-735.000 cv.doa ibu 37,674,482 1.65 %
6 2021 DINAS PEKERJAAN UMUM PENATAAN RUANG DAN PERTANAHAN KABUPATEN HULU SUNGAI UTARA Peningkatan Jalan Hambuku Raya - Hambuku Pasar Tender Pekerjaan Konstruksi 1734085 28899881 APBD 2,401,356,250 1,986,266,000 1,966,201,641 1,966,201,641 1,966,201,641 1,966,201,600 1,966,201,600 0 2021-04-27 09:00:00 2021-05-28 2021-06-10 90.253.448.6-735.000 CV. JANGAN LUPA BAHAGIA 90.253.448.6-735.000 CV. JANGAN LUPA BAHAGIA 435,154,609 18.12 %
7 2021 DINAS PEKERJAAN UMUM PENATAAN RUANG DAN PERTANAHAN KABUPATEN HULU SUNGAI UTARA Peningkatan Jalan Sungai Pinang - Pematang Benteng Tender Pekerjaan Konstruksi 1736085 28900043 APBD 4,104,000,000 3,976,538,000 3,948,533,642 3,948,533,642 3,948,533,642 3,948,533,600 3,948,533,600 0 2021-04-27 09:00:00 2021-05-28 2021-06-10 70.733.060.1-731.000 PT. AQILA AGUNG MULTI PERSADA 70.733.060.1-731.000 PT. AQILA AGUNG MULTI PERSADA 155,466,358 3.79 %
8 2021 DINAS PEKERJAAN UMUM PENATAAN RUANG DAN PERTANAHAN KABUPATEN HULU SUNGAI UTARA Rehabilitasi Jaringan Irigasi DIR Kayakah Desa Kayakah Kecamatan Amuntai Selatan Tender Pekerjaan Konstruksi 1737085 29125348 APBD 2,000,000,000 1,999,700,000 1,979,504,733 1,979,504,733 1,971,579,000 1,971,579,000 1,971,579,000 0 2021-04-27 09:00:00 2021-05-28 2021-06-11 01.249.228.6-735.000 CV HANAMAS 01.249.228.6-735.000 CV HANAMAS 20,495,267 1.02 %
9 2021 DINAS PEKERJAAN UMUM PENATAAN RUANG DAN PERTANAHAN KABUPATEN HULU SUNGAI UTARA Peningkatan Jalan Pulau Nyiur 2 - Pulau Damar Tender Pekerjaan Konstruksi 1738085 28899721 APBD 2,055,833,224 2,052,737,000 2,036,994,807 2,036,994,807 2,036,994,807 2,036,994,800 2,036,994,800 0 2021-04-27 09:00:00 2021-05-28 2021-06-10 71.364.465.6-733.000 CV. ELANG BANGUN SEMESTA 71.364.465.6-733.000 CV. ELANG BANGUN SEMESTA 18,838,417 0.92 %
10 2021 DINAS PEKERJAAN UMUM PENATAAN RUANG DAN PERTANAHAN KABUPATEN HULU SUNGAI UTARA Peningkatan Jalan Timbun Tulang - Pulau Damar Tender Pekerjaan Konstruksi 1739085 28899795 APBD 1,701,000,000 1,690,152,000 1,670,021,949 1,670,021,949 1,670,021,949 1,670,021,900 1,670,021,900 0 2021-04-27 09:00:00 2021-05-28 2021-06-10 80.413.022.7-735.000 CV.SINAR JATI 80.413.022.7-735.000 CV.SINAR JATI 30,978,051 1.82 %
Showing 1 to 10 of 66 entries
NoTahun AnggaranNama SatkerNama PaketMetode PemilihanJenis PengadaanKode TenderKode RUPSumber DanaPaguHPSNilai PenawaranNilai TerkoreksiNilai NegosiasiNilai KontrakNilai PDN KontrakNilai UMK KontrakTanggal Pengumuman TenderTanggal Penetapan PemenangTanggal KontrakNPWP Penyedia Pemenang TenderNama Penyedia Pemenang TenderNPWP Penyedia BerkontrakNama Penyedia BerkontrakSisa Selisih Pagu (silpa)Persentase SilpaNilai Kinerja Penyedia
1 2021 RSUD PAMBALAH BATUNG KABUPATEN HULU SUNGAI UTARA Penyusunan Detail Engenering Desain (DED) Rumah Sakit Daerah Baru Kabupaten Hulu Sungai Utara Seleksi Jasa Konsultansi Badan Usaha Non Konstruksi 1707085 26508644 BLUD 4,084,520,000 4,080,186,825 3,444,423,950 3,444,423,950 3,444,423,950 0 0 0 2020-11-09 08:00:00 2021-01-20 01.555.333.2-441.000 PT. PENTA REKAYASA 640,096,050 15.67 %
2 2021 DINAS KESEHATAN KABUPATEN HULU SUNGAI UTARA Konsultan Manajemen Konstruksi Pembangunan Rumah Sakit Seleksi Jasa Konsultansi Badan Usaha Non Konstruksi 1722085 26941893 APBD 1,999,470,000 1,999,444,000 1,819,422,000 1,819,422,000 1,819,422,000 1,805,777,000 0 0 2021-01-13 10:00:00 2021-03-04 2021-04-06 01.139.515.9-517.000 PT. SARANABUDI PRAKARSARIPTA 01.139.515.9-517.000 PT. SARANABUDI PRAKARSARIPTA 180,048,000 9 %
Showing 1 to 2 of 2 entries
NoTahun AnggaranNama SatkerNama PaketMetode PemilihanJenis PengadaanKode TenderKode RUPSumber DanaPaguHPSNilai PenawaranNilai TerkoreksiNilai NegosiasiNilai KontrakNilai PDN KontrakNilai UMK KontrakTanggal Pengumuman TenderTanggal Penetapan PemenangTanggal KontrakNPWP Penyedia Pemenang TenderNama Penyedia Pemenang TenderNPWP Penyedia BerkontrakNama Penyedia BerkontrakSisa Selisih Pagu (silpa)Persentase SilpaNilai Kinerja Penyedia
1 2021 DINAS PENGENDALIAN PENDUDUK DAN KELUARGA BERENCANA KABUPATEN HULU SUNGAI UTARA Pengadaan Furniture dan Kelengkapan Balai Penyuluhan KB Tender Cepat Pengadaan Barang 1810085 29726931 APBDP 549,109,000 528,000,000 450,206,500 450,206,500 450,206,500 452,540,000 0 0 2021-07-06 09:00:00 2021-07-09 2021-07-20 72.180.825.1-603.000 CV. Delta Sarana Media 02.995.376.7-005.000 CV.LIRA RAJA UTAMA 98,902,500 18.01 %
2 2021 DINAS PENGENDALIAN PENDUDUK DAN KELUARGA BERENCANA KABUPATEN HULU SUNGAI UTARA Pengadaan Sarana Prasarana Infrastruktur Sistem Informasi Keluarga di Balai Penyuluhan KB Tender Cepat Pengadaan Barang 1811085 29726706 APBDP 410,000,000 400,500,000 335,192,710 335,192,710 335,192,710 335,192,710 335,192,710 0 2021-07-06 09:00:00 2021-07-09 2021-07-27 03.223.724.0-643.000 CV Pratama Abadi Sejahtera 03.223.724.0-643.000 CV Pratama Abadi Sejahtera 74,807,290 18.25 %
3 2021 SEKRETARIAT DPRD KABUPATEN HULU SUNGAI UTARA Belanja Pakaian Dinas dan Atribut Pimpinan dan Anggota DPRD Tender Cepat Pengadaan Barang 1825085 29958644 APBD 470,250,000 467,250,000 464,340,000 464,340,000 464,340,000 0 0 0 2021-09-03 09:00:00 2021-09-06 91.121.275.1-444.000 CV. JAVA NUSANTARA 5,910,000 1.26 %
Showing 1 to 3 of 3 entries
Sumber data isb.lkpp.go.id penarikan tanggal 2024-06-12 02:21:38
Settings
  • Theme Mode

    Choose light or dark mode or Auto

  • Sidebar Theme

    Choose Sidebar Theme

  • Accent color

    Choose your primary theme color

  • Sidebar Caption

    Sidebar Caption Hide/Show

  • Theme Layout

    LTR/RTL

  • Layout Width

    Choose Full or Container Layout